Ink Filtration modules

PROBLEMS FACED

Management of a large project involving DFM and DFMA and specification of a number of different assembly processes to achieve hermetic seals in a highly quality critical product.

SOLUTIONS TO THE PROBLEMS

The project involved DFM and DFMA consultancy in conjunction with our customer to produce the part designs and mould tooling to ensure the successful launch of this highly quality critical assembly. The 15 suite set of tools were project managed through toolmaking and sampling and validation. MOST was used to determine the optimum assembly method and standard times. A complex assembly cell was developed including test equipment and all equipment items procured, verified and validated. Quality plans were developed, extensive validation of the final products undertaken and approval obtained in time for product launch.

TURNAROUND

18 months.

Precision Injection Moulding

Find out about OGM’s Precision Injection Moulding offerings

plastic injection moulders
plastic injection moulders
plastic injection moulding companies

Get in touch today to discuss your project and to find out more

Contact Us